Client : Ministry of Public Work – Kuwait
Contract no.: SE/61
Commencement date: 04/11/2020
Completion date: 03/11/2023
Brief Description of the project: Cleaning and CCTV Survey of 400Km of sewer network of various diameters (200mm up to 600mm) and replacement of the existing deteriorated network.
Client : Ministry of Public Work – Kuwait
Contract no.: : MS/R/415
Commencement date: 11/01/2022
Completion date: 10/01/2024
Brief Description of the project: CCTV, Maintenance , Replacement and Construction of storm water network and general maintenance to roads and squares as well.
Client : Ministry of Public Work – Kuwait
Contract no.: SE/189
Commencement date: 01/11/2016
Completion date: 31/10/2021
Brief Description of the project: Supply and lay of approximately 36km of new sewerage by open cut method and 6km by microtunneling method including 17600m of house connection of CCTV Survey for approximately 57km of sewerage pipeline and construction of 11km of stom water lines along with the rehabilitation of existing drainage box culverts and pipes culvert and construction of underground concrete storm drainage detention tank and associated access shafts and manholes. Asphalt work, Street lighting poles installation and construction of communication network such as ducts, manhole and handholes. Road Marking and Signage as well.
Client : Ministry of Public Work – Kuwait
Contract no.: SE/187
Commencement date: 26/02/2015
Completion date: 28/08/2018
Brief Description of the project: Construction of a main ductile iron line of 22km long and 700mm diameter along with a pumping station of four pumps (756m3/hr each ) and two reinforced concrete tanks having a capacity of 330m3 each.
Client : Ministry of Public Works – Kuwait
Contract no. : SE/191
Commencement date : 01/09/2016
Completion date : 01/09/2018
Brief Description of the Project: Construction of Main wastewater collection from Surra area to Pumping station A7.It is a gravity
line of 8.64km of Polycrete pipes of 1400mm and 1800mm diameter installing by microtunnelling
technique.
Construction of a provisional future connection points at several location of the main line, these
points consisted of 600mm diameter pipe of 8.40m long each.
Construction of new 41 manholes of depth varies from 15 to 30m.
Client : Ministry of Public Work – Kuwait
Contract no.: SE/53
Commencement date: 20/04/2015
Completion date: 20/04/2018
Brief Description of the project: Construction of 10km of sewer network of 200mm up to 500mm of HDPE pipes along with 500nbr. manholes and inspection chambers.Cleaning of 600km sewer network of various diameters(200mm up to 600mm).
Client : Ministry of Public Works – Kuwait
Contract no.: SE/99
Commencement date: 01/07/2011
Completion date: 10/03/2014
Brief Description of the project : Construction of sewer network of 28.5km of HDPE pipes of diameters varie from 200mm up to 800mm and of 3m to 6m depth by open cut method and of 12.8km of polycrete pipes to depth from 6m to 11m and diameters varie from 200mm up to 600mm. Construction of Potable water network of 30km of transmission lines of Ductile iron pipes K9 along with all related washout,air release valvse and gate valves chambers.Construction of distribution lines that include 250 house connections of ¾ and 1 inch of polybutilene pipes and 200 fire hydrant complete set.
Street lighting of 657 new poles and renovation of existing 265 poles including erection of 20nos feeders and 653manholes. Telephone network of 59.2km length with 665 Hanholes and 168 manholes as well.
Client : Ministry of Public Works – Kuwait
Contract no. : SE/115
Commencement date : 30/11/2009
Completion date : 31/03/2012
Brief Description of the project : Construction of sewer network of 93km of HDPE pipes of 200mm up to 800mm diameter by open cut method and 16km of Polycrete pipes of 200mm up to 1200mm diameter by microtunnelling process along with 3415 manholes of 2m to 6m depth. Construction of 148km of electrical duct for street lighting + installation of 2433 light poles. Construction of 150km of communication duct along with 1800nbr hand holes.
Client : Ministry of Public Works – Kuwait
Contract no. : SE/79
Commencement date : 12/11/2005
Completion date: 08/12/2010
Brief Description of the project : Construction of treated sewer effluent water networks of 15km of ductile iron pipes of diameter varies from 300mm to 500mm along with the construction of seven reservoirs of 1000m3 capacity each including the related mechanical rooms that comprise all related mechanical and electrical items, Such as2x 4 nbr vertical multistage pumps each of 60m3/hr at 80m TDH,valves,electrical panels and telemetry systems.Construction of 15km of Fiber optic duct.
Client : Ministry of Public Works – Kuwait
Contract no. : SE/39
Commencement date : 30/10/2009
Completion date: 31/03/2011
Brief Description of the project: Cleaning and CCTV Survey of 400km of sewer network,pipes of 200mm up to 800mm diameter along with the replacement and construction of 10 km of sewer network.
Client : Ministry of Public Works – Kuwait
Contract no. : SE/27
Commencement date : 02/09/2003
Completion date: 01/09/2006
Brief Description of the project : Construction of 23km of sewer network of 200mm up to 500mm diameter of HDPE pipe along with 1100nbr. Manhole & Inspection chambers. Cleaning & CCTV survey of 600km of sewer network.
Construction of a lift station of 15m depth equipped with three submersible pumps of 500l/min each.Supply and install of three mobile sewage treatment units of 300m3/day.
Client : Ministry of Public Works – Kuwait
Contract no. : MS/R/153
Commencement date : 01/05/2006
Completion date: 01/05/2008
Brief Description of the project : CCTV survey and cleaning of existing 1000km of storm water network along of the construction of 15km of storm water networks of pipes of 400mm up to 800mm dia.